diff --git a/css/style.css b/css/style.css index 01e7690..060a004 100644 --- a/css/style.css +++ b/css/style.css @@ -10525,4 +10525,34 @@ textarea.form-control { .stand-out-text { color: #ff6600; font-weight: 700; +} + +.customer-quote-button { + background: #ff6600; + color: #fff; + padding: 10px 20px; + border-radius: 4px; + text-transform: uppercase; + font-size: 0.85rem; + letter-spacing: 1px; + transition: background 0.3s ease; +} + +.blue-background { + background-color: #030918; + color: #fff; + padding: 50px 40px; +} + +.column-border-subtle { + border: 1px solid #ff6600; + padding: 30px; + border-radius: 8px; + transition: all 0.3s ease; + +} + +.column-border-subtle:hover { + border-color: white; /* Your brand orange */ + box-shadow: 0 10px 20px rgba(0,0,0,0.05); } \ No newline at end of file diff --git a/images/Loft-E-Engraved.png b/images/Loft-E-Engraved.png new file mode 100644 index 0000000..2403815 Binary files /dev/null and b/images/Loft-E-Engraved.png differ diff --git a/images/background/customer-reviews.jpg b/images/background/customer-reviews.jpg new file mode 100644 index 0000000..a16d7a2 Binary files /dev/null and b/images/background/customer-reviews.jpg differ diff --git a/images/background/footer_bg.jpeg b/images/background/footer_bg.jpeg new file mode 100644 index 0000000..26a701e Binary files /dev/null and b/images/background/footer_bg.jpeg differ diff --git a/images/background/footer_bg.webp b/images/background/footer_bg.webp new file mode 100644 index 0000000..a113096 Binary files /dev/null and b/images/background/footer_bg.webp differ diff --git a/images/background/lofte.jpg b/images/background/lofte.jpg new file mode 100644 index 0000000..0783b24 Binary files /dev/null and b/images/background/lofte.jpg differ diff --git a/images/background/meettheteam.jpg b/images/background/meettheteam.jpg new file mode 100644 index 0000000..4c3a6a9 Binary files /dev/null and b/images/background/meettheteam.jpg differ diff --git a/images/job-48-1024x1024.png b/images/job-48-1024x1024.png new file mode 100644 index 0000000..36b1b84 Binary files /dev/null and b/images/job-48-1024x1024.png differ diff --git a/images/universities.jpg b/images/universities.jpg new file mode 100644 index 0000000..6765a43 Binary files /dev/null and b/images/universities.jpg differ diff --git a/new-build-loft-boarding.php b/new-build-loft-boarding.php index e7aa8a0..98c2e4a 100644 --- a/new-build-loft-boarding.php +++ b/new-build-loft-boarding.php @@ -7,6 +7,292 @@ include_once $URLcorrection . 'includes/header.php'; ?> +
+
+
+

New Build Loft Boarding

+

NHBC warranty safe, university-tested LOFT-E® system. Professional installation, preserves insulation, maximises storage.

+ Arrange a free quote +
+
+
+ + + +
+
+
+

We specialise in creating storage in new build lofts with our very own LOFT-E®

+
+
+
+ New Build Loft Boarding with LOFT-E System +
+
+

All new build houses today have lofts that must conform to building regulations and government recommended loft insulation heights.

+

The LOFT-E® system has been designed to solve two problems when planning on boarding your loft for storage.

+

Firstly, boarding directly on top of your loft insulation is incorrect. Squashing or having to remove the existing loft insulation should never be done. Building above the insulation is now possible by using a product that is designed to last a lifetime. The LOFT-E® raised loft floor system can not only raise the loft floor platform above the insulation level, but it can also account for variations in joist height using the specialist adjustable legs where needed.

+

Secondly, a problem that plastic products face in a loft are the consistent temperature changes, plastic softens during the heat of summer and therefore has the potential for the legs to buckle and the storage floor to collapse. This can also happen in the cold of winter with the legs getting so cold that they can become very brittle and can have a tendency to fracture, again leaving you with the same problem. Hence why we chose 100% recyclable steel.

+
+
+
+
+ + +
+
+
+

The LOFT-E® System: University-Tested Excellence

+

Engineered specifically for new build homes with comprehensive testing credentials

+
+
+
+

University Tested & Proven

+

Comprehensive testing at Lancaster University and University of Central Lancashire (UCLAN): +

+
+
+
+ +
Stress Analysis
+
+
+
+
+ +
Thermal Stability
+
+
+
+
+ +
50+ Year Design
+
+
+
+
    +
  • Exceeded industry load requirements
  • +
  • Temperature range: -20°C to +60°C
  • +
  • Long-term durability verified
  • +
+ +
+
+
+

100% Recyclable Steel Construction

+ LOFT-E steel construction +

Unlike plastic alternatives that become brittle in cold and soft in heat, our steel legs maintain structural integrity in all UK loft conditions.

+
+
+
Why Steel Matters
+
+
+
-10°C
+ Winter Performance +
+
+
+50°C
+ Summer Performance +
+
+
+
    +
  • Consistent performance year-round
  • +
  • Environmentally sustainable
  • +
  • Superior strength-to-weight ratio
  • +
+
+
+
+
+
+ University testing Lancaster UCLAN +
Independently Verified Performance
+

Tested and verified by leading UK universities for structural integrity and thermal performance

+
+
+
+
+ + +
+
+
+
+

New Build Frequently Asked Questions

+
+
+
+
+

Are you able to board your loft in a new build home?

+

The answer is yes! Having it done correctly will be perfect for storing items in your loft

+

Will boarding my loft void my NHBC warranty?

+

One of the most common questions we get asked is “Will boarding my loft void my NHBC warranty?” The answer is NO it will not affect your warranty as long as it is installed correctly.

+

There are several reasons your builder may say otherwise with the following reasons:

+
    +
  • It will squash the insulation – this is not true.
  • +
  • The roof trusses are not strong enough to carry the extra weight – roof structure is strong enough.
  • +
  • It will cause damp – this is not true if done correctly with a raised loft boarding system like ours.
  • +
  • It will invalidate your NHBC warranty – correctly fitting loft boards using one of our raised floor systems will not affect your warranty.
  • +
+

How much weight can a new build loft take?

+

New houses constructed with loft hatches, built to British Standards are designed to carry 25kg per square metre of permanent load and 180kg per square metre of temporary load. Our floors are designed to hold more capacity than this. But we recommend sticking to this capacity.

+
+
+ New Build Loft Boarding +
+
+
+ +
+
+
+
+

NHBC Warranty Protection: The Facts

+

Get the truth about professional loft boarding and your warranty

+
+
+
+
+

Will Professional Loft Boarding Void My NHBC Warranty?

+ +
+

+ NO - When installed correctly with our LOFT-E® system, your NHBC warranty remains fully valid. +

+
+ +

The NHBC (National House Building Council) warranty covers structural defects for 10 years. Professional loft boarding using raised floor systems like our LOFT-E® does not affect this warranty because:

+ +
+

NHBC Compliance Checklist

+
+
+
    +
  • No insulation compression: Maintains full effectiveness
  • +
  • No structural modification: Original roof structure unchanged
  • +
  • Maintains ventilation: Airflow pathways unobstructed
  • +
+
+
+
    +
  • Load compliance: Within 25kg/m² limits
  • +
  • Professional installation: Certified technicians
  • +
  • Full documentation: Installation certificates
  • +
+
+
+
+ +

Why Builders May Discourage Loft Boarding

+

New build sales teams often discourage loft boarding for several reasons:

+ +
+
    +
  • Liability concerns: They want to avoid any post-sale issues
  • +
  • Lack of knowledge: Unfamiliarity with modern raised floor systems
  • +
  • Misinformation: Outdated understanding of loft boarding methods
  • +
  • Additional sales opportunity: Some builders offer their own (often inferior) loft packages
  • +
+
+
+ +
+
+
+ +
+
NHBC Official Statement
+

"Storage platforms in roof spaces are acceptable provided they are installed correctly and do not compromise the structural integrity or thermal performance of the building."

+
+ - NHBC Standards Chapter 7.1 +
+
+ + +
+
+
+
+ + +
+
+
+
+
+

Ready to Maximise Your New Build Loft Storage?

+

Join hundreds of satisfied new build homeowners across the North East

+ +
+
+
+

500+

+ New Builds Completed +
+
+
+
+

100%

+ NHBC Compliant +
+
+
+
+

10 Year

+ Product Warranty +
+
+
+
+

★ 4.9

+ Customer Rating +
+
+
+ + + +
+
+
+ + No Obligation +
+
+ + Professional Advice +
+
+ + NHBC Compliant +
+
+ + University Tested +
+
+
+
+
+
+
+